Features:
Steel Structure
Steel is the essential safety guarantee for tower crane. The steel we use for our tower crane is tower crane usage special square steel from Wuhan Iron and Steel Group. Steel material for those essential parts like lifting jib, tower top, frame etc is 16 Manganese Steel. Thus to assure safety, advance and high performance of the crane
Main lifting motor:
Thermal protection and currency protection.
Luffer:
It applies double-speed or three-speed motors for speed change control according to the jib length, easy running control, low impact force, high operation stability and high efficiency.
Safety:
A.Overload protection: If the material is over the capacity, the crane will give a sharp warning for protection itself.
B.Emergency brake: If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure.
C.Except for using the common security devices, we uniquely equips high definition operation tracking monitor system which can thoroughly supervise the lifting hook, ground and construction building and can assure safety operation when with sight
D.Control Method:Room control or remote control to avoid any injure to the operation staff.
Operating System:
Newly spacecraft type cabinet room with air conditioning system, wide eye view, high consideration of operator comfortableness and maximally to low down operation fault rate.
Technical Data
Performance | QTZ63 |
QTZ63 |
QTZ63 |
QTZ63 |
QTZ80 |
QTZ80 |
QTZ100 |
QTZ125 |
|
TC5010J-4 |
TC5011-4 |
TC5013-6 |
TC5611-6 |
TC5613-6 |
TC6010-6 |
TC6013-8 |
TC6016-8 |
||
Rated Hoisting Moment(Kilo-newton/meter) |
630 |
560 |
630 |
630 |
800 |
800 |
1000 |
1250 |
|
Maximum Loading Capacity(t) |
4 |
4 |
6 |
6 |
6 |
6 |
8 |
8 |
|
Working Range(m) |
3-50 |
2.5-50 |
2.5-50 |
2.5-56 |
2.5-56 |
2.5-60 |
2.5-60 |
2.5-60 |
|
Lifting height (Fixed/ Attachment) |
40/120 |
30/140 |
40.5/220 |
40.5/220 |
40.5/220 |
46/220 |
46/220 |
46/220 |
|
Rated Lifting Capacity at the end of Jib(t) |
1 |
1 |
1.3 |
1.1 |
1.3 |
1 |
1.3 |
1.6 |
|
Lifting Speed(meter/minute) |
2 Magnification |
65.6/32.8/9.2 |
80/40/8.5 |
80/40/8.88 |
80/40/8.88 |
80/40/8.88 |
80/40 |
80/40 |
100/50 |
4 Magnification |
32.8/16.4/4.6 |
40/20/4.2 |
40/20/4.44 |
40/20/4.44 |
40/20/4.44 |
40/20 |
40/20 |
50/25 |
|
Slewing Speed(turn/minute) |
0-0.62 |
0-0.60 |
0-0.60 |
0-0.65 |
0-0.65 |
0-0.65 |
0-0.8 |
0-0.8 |
|
Luffing Speed(meter/minute) |
40/20 |
40/20 |
40/20 |
40/20 |
40/20 |
53/27/12 |
0-55 |
0-55 |
|
Entire Total Power(kilowait) |
30.4 |
26.1 |
31 |
32.8 |
34.7 |
34.7 |
45 |
52 |
|
MOQ |
1 set |
||||||||
Delivery Time (days) |
12 |
12 |
12 |
12 |
15 |
15 |
20 |
20 |
|
Delivery Port |
Qingdao or Tianjin |